Metro G Line Intersection Aerial Survey

Project Website | Construction Notices

Metro’s contractor, Valley Transit Partners (VTP), anticipates conducting scheduled daytime drone operations over 13 intersections along the Metro G Line Busway to capture aerial at the Metro G Line Busway intersections between Van Nuys Bl to North Hollywood Station. The images will support the construction of the four-quadrant gating system. The drone missions will comply with FAA regulations, occur during non-peak traffic hours, and avoid capturing imagery over private property. 

  • Dates for Construction Activity: June 3, 2025 –  June 9, 2025 
  • Work Location: Metro G Line Busway Intersections between Van Nuys Bl to North Hollywood Station.  
  • Construction Work Hours: Monday to Friday from 6:00 AM to 6:00 PM. Weekend work from 8:00 AM to 6:00 PM or Nighttime Work from 8:00 PM to 8:00 AM. Weather permitting. 
What to Expect 
  • Flying the drone up to 200 ft maximum to capture aerial photos of Metro G Line Busway intersections. 
  • Each site visit will be limited to approximately 20–30 minutes, scheduled during non-peak traffic periods. 
  • Drone operations will be conducted without disruption to bus service, roadway traffic, pedestrian pathways, or bike access. 
Additional Information
  • All work must receive the necessary permits and approvals prior to work beginning. 
  • Access to emergency responders will be maintained. 
  • Access to driveways, residences & businesses will be maintained unless notified in advance. 
  • Construction is a dynamic process and work schedules and timelines are subject to change. 
  • If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at http://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org. 

Privacy Policy | Terms of Use
Copyright ©2025 Metro