Back to Active Notices     Back to Project Page
N Bel Air Pl / Bel Air Rd Geotechnical Fieldwork

Summary

Metro’s subcontractor will be performing required preliminary, limited geotechnical fieldwork to gather information on existing soil and rock conditions on N Bel Air Pl near the intersection with Bel Air Rd. 

When 
  • Late October 2026 to late January 2027
Work Hours
  • Monday – Friday, 9am-3:30pm, Saturday, 8am-6pm
Parking Restrictions
  • There will be periodic parking restrictions along both the eastbound and westbound shoulders of Bel Air Pl.
Lane Closures
  • There will be periodic lane closures of portions of the westbound lane of Bel Air Pl from the intersection with Bel Air Rd to approximately 100 feet to the west. 
Traffic Control
  • At the intersection of N Bel Air Pl and Bel Air Rd, flaggers will be in place to allow traffic around the closure in one direction at a time. 

More Information
Local access, Pedestrian Access, and Emergency Responder Access will be maintained during work activities.

Construction is a dynamic process, and information is subject to change without notice.

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App for current service information and trip planning.

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.

Privacy Policy | Terms of Use
Copyright ©2026 Metro