I-105 ExpressLanes Project
Back to Work Notices

Extended Freeway Lane Closures – Sign Structure Installation

Summary: Metro has a plan to ease traffic and enhance safety on the I-105, which includes the conversion of the existing High Occupancy Vehicle (HOV) lane, or carpool lane, into two Metro ExpressLanes in each direction on the I-105. Major construction for the first phase of the project, Segment 1 between Sepulveda Bl and Central Av, started in early 2025 and is anticipated to be completed in year 2028.  

As part of these improvements, work crews will implement extended lane closures on the weekend of September 11th to support activities along the I-105 freeway. This work is part of a series of overhead sign structure installations, which support the overall project improvements, including the implementation of the new ExpressLanes. 

Work Hours: Closures on westbound I-105 from Wilmington Av to the I-110 connector beginning Friday, September 11, at 10pm through Sunday, September 13, at 10am.

Location/What to Expect: 

Westbound I-105 
  • Center lanes including the HOV and #1 lane will be closed on westbound I-105. 
  • Other westbound travel lanes will remain open to traffic. 
  • The Westbound Wilmington Av on-ramp will be closed. Please follow posted detour signage. 
    • Motorists are encouraged to use Imperial Hwy to Central Av to access I-105. The Vermont Av on-ramp will also be available as an alternate option for accessing I-105 from Imperial Hwy. 
  • A Metro C Line bus bridge will be in place from September 4 at 4am through Sunday, September 13 at 9am from the Willowbrook/Rosa Park Station to the Harbor Fwy Station, with the Avalon Station closed. 
Noteworthy: 
  • Traffic control measures and advance signage will be in place to safely guide motorists through the work area. 
  • Please note that work schedules are subject to change based on the progress of work and weather conditions. 
  • For electronic project updates, please sign up under Contact Us at Metro.net/105expresslanes.
  • Please note that construction is dynamic and work schedules are subject to change based on the progress of work and weather conditions.  

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter
@metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.
Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. |
Survey

Privacy Policy | Terms of Use
Copyright ©2026 Metro