I-105 ExpressLanes Project
Back to Work Notices

Full Directional Freeway Closures: I-105 (I-405 through I-110)

Please plan ahead or adjust your travel if necessary. 

Metro has a plan to ease traffic and enhance safety on the I-105, which includes the conversion of the existing High Occupancy Vehicle (HOV) lane, or carpool lane, into two Metro ExpressLanes in each direction on the I-105. Major construction for the first phase of the project, Segment 1 between Sepulveda Bl and Central Av, started in early 2025 and is anticipated to be completed in year 2028. 

Work crews are anticipated to perform directional full freeway closures on eastbound I-105 over three nights, beginning Friday, September 11, between I-405 and I-110. These freeway closures are required to facilitate freeway restriping on the I-105 to support the next phase of the project and construction of the tolling system for the new ExpressLanes. 

Work Hours and Locations: The closures and construction work are scheduled to occur in the eastbound direction at the following locations and on the following dates, progressing eastbound from I-405 to I-110: 

Friday, September 11 
I-405 to Prairie Av 

Monday, September 14 
Prairie Av to Crenshaw Bl 

Tuesday, September 15 
Crenshaw Bl to I-110 

Closure Hours: 
  • HOV and Inside Lane Closures: Starting at 9pm
  • Full Closure: 12am to 5am 
Detour: 
  • East on I-105 
  • Continue to SB I-405 
  • Exit at El Segundo Bl 
  • North on La Cienega Bl 
  • East on Imperial Hwy 
  • On-ramp to EB I-105 

Closure Hours: 
  • HOV and Inside Lane Closures: Starting at 10:30 pm 
  • Full Closure: 1am to 5am 
Detour: 
  • East on I-105 
  • Exit to Prairie Av 
  • South on Prairie Av 
  • East on 120th St  
  • On-ramp to EB I-105 

Closure Hours: 

  • HOV and Inside Lane Closures: Starting at 10:30 pm
  • Full Closure: 1am to 5am 

Detour: 

  • East on I-105 
  • Exit to Crenshaw Bl 
  • East on 120th St 
  • North on Crenshaw Bl 
  • East on Imperial Hwy 
  • South on Vermont Av 
  • East on 116th Pl 
  • On-ramp to EB I-105

What to Expect:  

  • To safely perform this work, corresponding ramps will be closed to perform these work activities.   

  • Advance signage will be in place to notify motorists of detours, as well as freeway and lane closures. 

Noteworthy: 

  • Traffic control measures and advance signage will be in place to safely guide motorists through the work area. 

  • Please note that work schedules are subject to change based on the progress of work and weather conditions. 

  • For electronic project updates, please sign up under Contact Us at Metro.net/105expresslanes. 

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter
@metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.
Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. |
Survey

Privacy Policy | Terms of Use
Copyright ©2026 Metro