Back to Active Notices     Back to Project Page
Knobhill Dr/Beverly Glen Geotechnical Fieldwork

Summary


Metro’s subcontractor will be performing required preliminary, limited geotechnical fieldwork to gather information on existing soil and rock conditions at the intersection of Knobhill Dr and Beverly Glen Bl. 

When 
  • October through Mid-November 2026
Work Hours
  • Monday – Friday, 9am-3:30pm
  • Work will be periodic with a cumulative duration of up to 18 days. 
Parking Restrictions
  • There will be periodic parking restriction along Knobhill Dr for a distance of approximately 200 feet north of the intersection with Beverly Glen Bl.
Lane Closures
  • There will be periodic lane closures along Knobhill Dr from Beverly Glen Bl. As a result, access to/from Knobhill Dr from/to Beverly Glen Bl during these periods will be flagger-controlled. 

More Information
Local access, Pedestrian Access, and Emergency Responder Access will be maintained during work activities.

Construction is a dynamic process, and information is subject to change without notice.

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App for current service information and trip planning.

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.

Privacy Policy | Terms of Use
Copyright ©2026 Metro