Lane Closures on Wilshire for DWP Cutover

Summary 

DWP will be performing a cutover and road restoration on Wilshire Blvd. Phase 1 work is beginning Tuesday night. TPOG will set traffic control on Wilshire Eastbound on the internal most of the two left turn lanes and Wilshire Westbound on the internal most of the two left turn pockets at Westwood to support DWP to access manhole on Wilshire Blvd. 
 

Construction Period: October 8th to November 27th

Work Hours: Monday through Friday 9:00 PM – 6:00 AM  


Traffic Control:  

• Multiple-Lane closures along Wilshire Blvd.  

• Road access is maintained on either side of the construction work area.  

• Sidewalk access will be maintained.  


Noteworthy:  

• All work has received the necessary permits and approval.  

• Access to driveways, residences, and business will be maintained at all times unless notified in advance.  

• Access for pedestrians will be maintained outside of construction zones.  

 • Access for the Fire Department and emergency responders will be maintained.   

• For construction-related issues needing immediate attention, please call Metro’s 24-hour Hotline at 213.922.6934. 

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter @metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. Passengers are encouraged to use the Transit App to plan their travels. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA HOP at www.lahsa.org/portal/apps/la-hop/request.   

For more information and referrals for any Health and Human services, please dial 2‐1‐1, call (800) 399‐6993, or visit 211LA.org. 
Privacy Policy | Terms of Use
Copyright ©2024 Metro