Back to Active Notices     Back to Project Page
Oakfield Dr Geotechnical Fieldwork

Summary

Metro’s subcontractor will be performing required preliminary, limited geotechnical fieldwork to gather information on existing soil and rock conditions on Oakfield Dr, approximately 600 feet north of the intersection with Beverly Glen Bl. 

When 
  • Mid-December 2026 to January 2027
Work Hours
  • Monday – Friday, 9am-3pm
  • Work will be periodic with a cumulative duration of up to four weeks. 
Lane Closure
  • An approximate 100-foot section of the east shoulder and lane of Oakfield Dr, approximately 150 feet south of the property at 3566 Oakfield Dr, will be periodically closed. 
Parking Restrictions
  • Parking along the east shoulder of the roadway will also be restricted during this timeframe. 

More Information
Local access, Pedestrian Access, and Emergency Responder Access will be maintained during work activities.

Construction is a dynamic process, and information is subject to change without notice.

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App for current service information and trip planning.

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.

Privacy Policy | Terms of Use
Copyright ©2026 Metro