91 Eastbound Safety Project
Back to Work Notices

Metro is making safety improvements on the Eastbound SR-91 from the Southbound I-710 to the Eastbound SR-91 connection through Atlantic Av and Cherry Av. Work on Eastbound SR-91 is designed to reduce collisions, improve vehicle merging, and help traffic move more safely in this area. Improvements include a new eastbound auxiliary lane and a new, higher soundwall along the corridor. 

Below is the weekly look-ahead schedule detailing the upcoming construction activities, localized impacts, and work hours scheduled for your area.  
 

 
Activity Location along SR-91 Corridor Hours Days Additional Details
Soundwall and Retaining Wall Removal and Excavation E 67 St. / EB SR-91 Atlantic Av off-ramp Myrtle Av   7am–7pm  Monday– Friday 
Crews will access work zone via E 67th St and EB SR-91 Atlantic Av on and off-ramp.  
Shoring Installation E 67th Street between Atlantic Av and Myrtle Av  7am–7pm  Monday– Friday  
Temporary structure to stabilize soil during excavation. 

Temporary Drainage System and Stormwater Pollution Prevention Measures  

 
EB SR-91 Atlantic Av to Myrtle Av   7am–7pm  Monday–
Friday  
The temporary drainage system and large containers collect debris and material run-off during construction. 
Construction material removal E 67 St. between Millmark Av and Myrtle Av  9am– 6pm Saturdays (Beginning 10/24/26) Crews will use E 67th St to remove excavated material.
Placement and bracing of temporary light poles  EB SR-91 Mainline and EB SR-91 Atlantic off-ramp  8pm – 6am Thursday (10/22) and Friday (10/23)  Freeway and ramp lane closures will be utilized. 

Work activities require increased use of trucks with backup safety alarms. 

PARKING RESTRICTIONS 
  • No parking on the north side of 67th St between Atlantic Av and Myrtle Av only
  • Intermittent parking restrictions east of Myrtle Av, as needed while crews access work area
PEDESTRIAN DETOUR  
  • The sidewalk on the north side of E 67th St between Millmark Av and Myrtle Av will be closed to pedestrians.
  • Detour signs will direct foot traffic safely around the closure.
  • Residents will be routed to the designated crosswalks at Barry Dr and Lime Av, as well as E 67th Street and Myrtle Av to access the sidewalk on the opposite side of the closure. 
GENERAL CONSTRUCTION SCHEDULE INFORMATION
  • Monday to Friday, 7am to 7pm
  • Night work may occur intermittently from 8pm to 6am
  • Saturdays, 9am to 6pm, as needed 
  • Work on Sundays may occur only with prior approval
  • Work on Sundays is not expected at this time
CONTACT US

Visit: Metro.net/EB91
Email: eb91@metro.net
Phone: (213) 922-4091
SMS updates: https://91projectupdates.com

More Information
Local access, Pedestrian Access, and Emergency Responder Access will be maintained during work activities.

Construction is a dynamic process, and information is subject to change without notice.

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use
Metro’s App for current service information and trip planning.

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.

Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. |
Survey

Privacy Policy | Terms of Use
Copyright ©2026 Metro