Metro’s contractor, C Below, Inc., will be conducting underground utility investigations along the project alignment in the City of South Gate in preparation for future engineering design of the Southeast Gateway Line. The work will include an excavation process to locate underground utility lines.
Dates: Monday, 3/23/26 to Friday, 5/29/26 (weather permitting, excluding holidays)
Work Hours: Monday to Friday, 8:30am - 5:30pm
Locations:
-
Gardendale St and Dakota Ave -
Main St and Dakota Ave
-
Neville Ave and Mason S -
Rayo Ave and Firestone Bl -
Firestone Pl and Firestone B -
Ardine St and Salt Lake Ave
Work Hours: Monday to Friday, 9am - 2:30pm
Locations:
-
Santa Ana St and Salt Lake Av
-
Firestone Bl and Firestone P -
Southern Ave and Salt Lake Av -
Imperial Hwy and Garfield P -
Atlantic Ave and Patata S
-
Rayo Ave and Firestone Bl
What to Expect
-
Equipment in the street, excavations, and surface conditions will be restored (e.g., patching roads and pavement) after drilling is completed.
Noteworthy
-
Access to private driveways, residences, and businesses, will always be maintained unless notified in advance.
If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org. |