Back to Active Notices     Back to Project Page
Van Nuys Bl - Burbank Bl Geotechnical Fieldwork

Summary

Metro’s subcontractor will be performing required preliminary, limited geotechnical fieldwork to gather information on existing soil and rock conditions along Van Nuys Bl between Burbank Bl and Magnolia Bl. 

When 
  • Mid-September through October 2026
Work Hours
  • Monday – Friday, 9am-3:30pm
  • Work will be periodic with a cumulative duration of up to one week. 
Parking Restrictions
  • There will be periodic parking restrictions along the east shoulder of Van Nuys Bl between Chandler Bl and Weddington St.
Lane Closures
  • There will be periodic closures of portions of the eastern (inside) southbound lane and turn pockets and portions of the eastern (outside) northbound lane and shoulder. 

More Information
Local access, Pedestrian Access, and Emergency Responder Access will be maintained during work activities.

Construction is a dynamic process, and information is subject to change without notice.

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App for current service information and trip planning.

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.

Privacy Policy | Terms of Use
Copyright ©2026 Metro