Metro C Line Service Changes: July 2024 through January 2025

Overhead Wire Replacement Project, Phase 2

Project Website


Please be advised that Phase 2 of the overhead wire replacement work for the east end of the C Line between Willowbrook/Rosa Parks Station and Norwalk Station will begin July 14, 2024.

The following changes to C Line service will be necessary to allow staff access to one of the two operating tracks to complete the replacement of overhead wires that provide the power supply for each train. The current wires are approaching 30 years and need to be replaced to ensure reliable service.

C Line service changes to accommodate this critical work are as follows:

Sunday, July 14 through Saturday, August 17, 2024
C Line service will operate every 20 minutes on weekdays, Saturdays, and Sundays between Norwalk Station and Redondo Beach Station. Additional trains will operate between Willowbrook/Rosa Parks Station and Redondo Beach Station weekdays between 5am and 8:30am and between 2pm and 6:30pm.

Sunday, August 25 through Saturday, August 31, 2024
A bus bridge will operate to replace C Line rail service between Willowbrook/Rosa Parks Station to Norwalk Station. Free shuttles will take passengers to the following stations: Willowbrook/Rosa Parks, Long Beach Bl, Lakewood Bl and Norwalk. 

Monday, October 28, 2024, through Monday, January 27, 2025
Normal 10-minute C Line service frequency will operate between Norwalk Station and Redondo Beach Station. At a date yet to be confirmed during this period, a new structure for the C and K Lines will be launched as Metro prepares to open the new LAX/Metro Transit Center Station.

Work on phase 2 of the C Line overhead wire replacement program will continue in 2025. Further details on C Line service impacts will be released closer to 2025 based on project progress and coordination with the opening of the new LAX/Metro Transit Center Station.

Metro apologizes for any inconvenience these changes may cause. Please allow additional time for travel. These revised C Line schedules will be reflected on Google and other trip planning aps. Detailed schedules will also be posted at metro.net for each of the above periods.
 

Metro Updates

Construction is a dynamic process and information is subject to change without notice, visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter @metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. Passengers are encouraged to use the Transit App to plan their travels. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA HOP at www.lahsa.org/portal/apps/la-hop/request.   

For more information and referrals for any Health and Human services, please dial 2‐1‐1, call (800) 399‐6993, or visit 211LA.org. 
Privacy Policy | Terms of Use
Copyright ©2025 Metro