The contractor is preparing to demolish and reconstruct the intersection of San Pedro St. as part of the Rail-to-Rail Active Transportation Corridor (ATC) Project. Work is estimated to begin on Monday, June 3, 2024.

What: 

The contractor will begin improving the street, sidewalk, and storm drain structures and installing street lighting.

Where:

>    At the intersection of San Pedro and Slauson Av. Intersection between 59th Pl. and 57 St. from Wall St. to Avalon Bl.

When:  

>   Beginning June 3, 2024, for five and a half months.
>    Monday to Saturday, 7 am to 3:30 pm
>    Night work as needed, weather permitting

What to Expect:

Directional street closures will be in place 24/7 for approximately five and a half months; the closures will be implemented in four consecutive stages.

>    Stage 1A: directional closure and detour of northwest San Pedro St. from Slauson Ave. to 58th St. and approximately halfway through the intersection of San Pedro St and Slauson Av; just east of S Los Angeles St
>    Stage 1B: directional closure and detour of southwest San Pedro St. between S Los Angeles St. and San Pedro Pl.
>    Stage 2A: directional closure and detour of northeast San Pedro St. from Slauson Ave. to 58th St. and just west of Slauson Ave. and San Pedro Pl.
>    Stage 2B: directional closure and detour of southeast San Pedro St. between S Los Angeles St. and San Pedro Pl.
>    Noise and dust control measures will be in place to minimize impacts.
>    Construction night work, if needed, will be minimized and will be within allowable noise levels.

Noteworthy: 

>    All work will receive necessary permits and approvals from the City of Los Angeles prior to the start of work.
>    Access for emergency vehicles will be maintained.
>    Pedestrian access will be maintained outside the work area. 
>    Access to business/residential driveways within the work zone will be maintained.
>    Construction is a dynamic process, and information is subject to change as the conditions warrant. 


 

Metro Updates

Construction is a dynamic process and information is subject to change without notice, visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter @metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. Passengers are encouraged to use the Transit App to plan their travels. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA HOP at www.lahsa.org/portal/apps/la-hop/request.   

For more information and referrals for any Health and Human services, please dial 2‐1‐1, call (800) 399‐6993, or visit 211LA.org. 

Privacy Policy | Terms of Use
Copyright ©2024 Metro