AKA Alley Demo, Removal, and Restoration Work 
 

Summary 

The contractor will be performing demolition, removal, and restoration work in the AKA alley (between N Canon Dr and N Crescent Dr) throughout the month of May. Soundwall and pile foundation removal will be conducted from Monday, May 4 through Friday, May 8. There will be no alley closure during this period of work activity. Starting Monday, May 11 through Monday, May 18 the contractor will close the AKA alley and begin alley improvement activities, including demolition and removal of existing asphalt concrete and base sections, base preparation, fine grading, strip gutter and curb placement, and asphalt paving.  Noise-generating activities, including pavement breaking and removals, will begin at 9AM during demolition work.  

Where

  • In the alleyway between N Canon Dr and N Crescent Dr at Wilshire Bl, from the alley approach at Wilshire Bl to approximately 180 feet north, at the end of the Canon Yard Wall.

When 

  • Monday, May 4 through Friday, May 8, there will be no alley closure during this period of work activity.  
    Monday, May 11 through Monday, May 18 the contractor will close the AKA alley for work activity.   

Work Hours

  • Daytime Work Hours: 7AM-4:30PM (Permitted noisy activities performed from 9AM-4:30PM) 

Traffic Control

  • No alley closure is anticipated during soundwall and pile foundation removal.  
  • The AKA alley will be closed to support alley improvement activities from the alley approach at Wilshire Bl to approximately 180 feet north, at the end of the Canon Yard Wall. 
  • Partial access to the AKA’s driveway for monthly parking in the alley will be maintained during the closure.   
  • Temporary signage and traffic control devices will be installed to direct motorists and pedestrians around the work area.  
  • Noise-generating activities, including pavement breaking and removals, will begin at 9AM during demolition work. 

Metro Access

  • Metro bus stops may be relocated, or lines could be impacted. Please call 323.GoMetro for details.

Contact Information

  • For urgent construction related matters needing immediate attention, please call the Metro 24/7 Hotline on 213.922.6934 

Noteworthy  

  • All work has received necessary permits and approvals. 
  • Access for pedestrians will be maintained outside of the construction zone. 
  • Access for emergency responders will be maintained. 
  • Construction is a dynamic process and the schedule is subject to change. 
  • 24/7 Hotline: 213-922-6934 

Next Community Meeting: 

  • D Line - Beverly Hills Stations​, May 13, 2026, at 12pm, Virtual 
  • Link: https://us02web.zoom.us/j/82203486209 Webinar ID: 822 0348 6209  

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter @metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.
Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. | Survey
Privacy Policy | Terms of Use
Copyright ©2026 Metro