East San Fernando Valley Light Rail Transit (ESFV LRT)

Project Website | Active Work Notices
The East San Fernando Valley Light Rail Transit (ESFV LRT) Project will improve connections and access to crucial destinations while connecting transit users to the growing network in the San Fernando Valley. The Southern Segment of the project includes a 6.7-mile at-grade alignment that will operate in the center of Van Nuys Bl, from the Metro G Line Van Nuys Station to San Fernando Rd. 

SUMMARY

Metro’s contractor, San Fernando Transit Constructors (SFTC), will conduct utility installation work on Van Nuys Bl, between Telfair Av and San Fernando Rd. Lane restrictions will be in place along Van Nuys Bl. The street will remain open to traffic in both directions, with some turn restrictions in effect during construction. The bike lane will be closed intermittently, and certain driveways and crosswalks will be temporarily closed while work is underway. 

This work will include the installation of new waterlines and construction activities will involve traffic control implementation, potholing, excavation, trenching, shoring and backfill, and roadway restoration. Additionally, K-rail concrete barriers will be installed at a later date as part of utility work activities, and this will affect on-street parking and the street configuration.  

DATE AND WORK HOURS

Beginning Wednesday, January 28, 2026, through early-Spring 2027. Work will take place at night from 8:00pm to 6:00am, Monday through Friday. Saturday work may occur as needed. 

LOCATION

Van Nuys Bl from Laurel Canyon Bl to San Fernando Rd 

WHAT TO EXPECT
  • Van Nuys Blvd will remain open with lane restrictions.  
  • Water access will be restricted for one night during waterline relocation work. Impacted areas will be noticed in advanced. 
  • Access to private driveways, residences, and businesses will always be maintained unless notified in advance. 
  • The road will be fully reopened to vehicular traffic daily outside of work hours. 
  • Flaggers will be provided at various locations to direct traffic and pedestrians if access is restricted.  
  • Parking is restricted in posted areas, please follow the signage. 
  • Bus stops will be temporarily relocated as necessary, please follow the signage. 
  • The bike lane will be intermittently closed during construction, please follow the signage. 
  • Crosswalks in this area may be temporarily closed and pedestrians will be detoured to get around the closure, please follow the signage. 
NOTEWORTHY
 
  • Access to emergency responders will be maintained.
  • Construction is a dynamic process and work schedules and timelines are subject to change. 
  • Noise and dust control measures will be in place to minimize impact


If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2-1-1 or 1 (800) 399-6993 or visit 211LA.org.       

Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. | Survey