East San Fernando Valley Light Rail Transit (ESFV LRT)

Project Website | Active Work Notices
Tree Removals: Van Nuys Bl from Oxnard St to San Fernando Rd
 
The East San Fernando Valley Light Rail Transit (ESFV LRT) Project will improve connections and access to crucial destinations while connecting transit users to the growing network in the San Fernando Valley. The project includes a 6.7-mile at-grade alignment that will operate in the center of Van Nuys Bl, from the Metro G Line Van Nuys Station to Van Nuys Bl and San Fernando Rd.

SUMMARY
 
As part of the East San Fernando Valley Light Rail Transit (ESFV LRT) Project, Metro’s contractor, San Fernando Transit Constructors (SFTC), will remove thirty-three (33) trees along the project corridor and adjacent side streets to accommodate construction of the new light rail line. This work will only include the removal of the trees. Replanting efforts will take place in the future along the project corridor and adjacent side streets, in accordance with City of Los Angeles requirements, which require two new trees to be planted for every tree to be removed.
 
Work will include the implementation of traffic control and construction vehicles and equipment in the streets, curbs, and medians. Tree trimming and removal will be performed, followed by restoration of the areas where trees are removed.
 
DATE AND WORK HOURS
 
November 2, 2026, through mid-November 2026, from 8am to 6pm, Monday through Friday.
 
LOCATION
 
Van Nuys Bl between Oxnard St and Vanowen St, and between Laurel Canyon Bl and San Fernando Rd.
 
WHAT TO EXPECT
  • Lane restrictions are expected in curb lanes and medians at various intersections to accommodate tree removal work. Traffic control measures will be in place to ensure safety during construction.
  • Flaggers will be provided at various locations to direct traffic. If a sidewalk is closed, nearby sidewalks will be maintained to provide safe pedestrian access. 
  • Parking is restricted in posted areas. Please follow all posted signage, as vehicles may be cited or towed.
  • Access to private driveways, residences, and businesses will always be maintained unless notified in advance
  • Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App (metro.net/riding/la-metro-app) for current service information and trip planning.
     
NOTEWORTHY 
  • Tree removals will be conducted in accordance with applicable City of Los Angeles requirements and procedures, including all necessary approvals and public notification requirements.
  • Construction is a dynamic process and work schedules and timelines are subject to change.
  • Noise and dust control measures will be in place to minimize impacts.
  • Metro’s small business mitigation programs may assist small businesses impacted by construction:
  • For Business Interruption Fund program and eligibility information, visit metro.net/bif.
  • For Eat Shop Play program information, please visit metro.net/eatshopplay.

More Information
Local access, Pedestrian Access, and Emergency Responder Access will be maintained during work activities.

Construction is a dynamic process, and information is subject to change without notice.

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App for current service information and trip planning.

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.

Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. | Survey

Privacy Policy | Terms of Use
Copyright ©2026 Metro