Demolition of Southeast Plaza of 10900 Wilshire Bl 

Summary 

Metro contractors will begin demolition of the southeast plaza of 10900 Wilshire Bl. Work is anticipated to begin Thursday, April 24 and continue for up to eight weeks. Activities include dismantling of existing structures, removal and hauling of waste material, piling, concrete pouring, and preparation of the site for future construction. 

Date: Monday, May 12, 2025, for up to eight weeks 

Work hours: Monday to Friday, 9 pm to 6 am, and Saturday and Sunday, 5 am to 4 pm and 7:30 pm to 5 am.

Traffic Control: 

Phase 1: Closure of #2, 3, and 4 lanes of eastbound Wilshire Bl, between Veteran and Westwood Bl and the west leg of the pedestrian crosswalk at the intersection of Wilshire and Westwood Bl. 

Phase 2: Closure of #4 lane of eastbound Wilshire Bl, between Gayley Av and Westwood Bl and the west leg of the pedestrian crosswalk at the intersection of Wilshire and Westwood Bl. 

Thru-traffic and driveway access will be maintained at all times. Pedestrians will be detoured to adjacent crosswalks during work hours. 

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter @metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.
Privacy Policy | Terms of Use
Copyright ©2025 Metro