North Wilshire Sidewalk Restoration between Crescent Dr and Beverly Dr

Summary 

The contractor will be implementing temporary lane and sidewalk closures on Wilshire Bl between Crescent Dr and Beverly Dr to support material and equipment delivery, deck removals, and street restoration. This work is anticipated to take place from January 28th - February 20th with work hours of 8:00 AM to 9:00 PM.  

When 

  • Wednesday, January 28th – Friday, February 20th   
  • Work hours: 8AM-9PM  


Where

  • North side of Wilshire Bl  
  • Saw cutting, jackhammering, and the use of vacuum trucks are prohibited during the following times and locations: 
    • 12:00 PM to 2:30 PM, Monday through Saturday, on N Canon Dr 
    • 6:00 PM to 9:00 AM, Monday through Friday, on all streets 
    • 6:00 PM to 10:00 AM, Saturday through Sunday, on all streets 


Traffic Control

  • Work activity will take place along Wilshire Bl between Crescent Dr and N Canon Dr. 
  • Move Ped access bullet here (from the bottom) 
  • ADA-compliant ramps will be maintained or temporarily installed at appropriate street crossings to facilitate a safe pedestrian walkway.   
  • The contractor shall install pedestrian fencing without sound panels and without mesh screening, ensuring pedestrian visibility is maintained. 
  • K-rail will placed along the entire work zone on Wilshire Bl.   
  • Building access with be maintained 
  • Flaggers will be on site to support with vehicle and pedestrian activity.  
  • Pedestrian access will be assessed as needed and modifications may be required to maintain adequate access to the side and adjacent properties. 


Metro Access

  • Metro bus stops may be relocated, or lines could be impacted. Please call 323.GoMetro for details.


Noteworthy  

  • All work has received necessary permits and approvals. 
  • Access for pedestrians will be maintained outside of the construction zone. 
  • Access for emergency responders will be maintained. 
  • Construction is a dynamic process and the schedule is subject to change. 
  • 24/7 Hotline: 213-922-6934 

Next Community Meeting: 

  • D Line Extension Section 1 & 2 Webinar, February 11, 2026, Noon-1pm 
  • Link: https://us02web.zoom.us/j/82396121677 
  • Webinar ID: 823 9612 1677

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter @metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.
Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. | Survey
Privacy Policy | Terms of Use
Copyright ©2026 Metro