East San Fernando Valley Light Rail Transit (ESFV LRT)

Project Website | Active Work Notices
Advanced Utility Work: Victory Bl Full Closure

The East San Fernando Valley Light Rail Transit (ESFV LRT) Project will improve connections and access to crucial destinations while connecting transit users to the growing network in the San Fernando Valley. The project includes a 6.7-mile at-grade alignment that will operate in the center of Van Nuys Bl, from the Metro G Line Van Nuys Station to Van Nuys Bl and San Fernando Rd.

SUMMARY

Metro’s contractor, San Fernando Transit Constructors (SFTC), will conduct utility relocation work at the Van Nuys Bl and Victory Bl intersection. Victory Bl will be fully closed at the intersection, with the west side closed first, followed by the east side. Van Nuys Bl will remain open to traffic with at least one lane in each direction. Work will include potholing, demolition, trench excavation, conduit and vault installation, backfill, and paving.

DATE AND WORK HOURS

Work is scheduled Monday through Friday, from 8pm to 6am, weather permitting. Work will occur as needed and may not take place every night:
  • West Victory Bl full closure (1-month): November 16 – December 11, 2026
  • East Victory Bl full closure (1-month): December 14, 2026 – January 15, 2027
  • Victory Bl will reopen by 6am the next day.
LOCATION

The intersection of Van Nuys Bl and Victory Bl, with traffic control extending along both streets.

WHAT TO EXPECT
  • A detour will be in place for each closure.
  • Van Nuys Bl will remain open in both directions with reduced lanes. Please follow posted signs.
  • Crosswalks or sidewalks may be temporarily closed. Pedestrians should follow posted detour signs.
  • Access to private driveways, residences, and businesses will always be maintained unless notified in advance.
  • Please follow posted parking restrictions to avoid being ticketed or towed.
  • Nearby bus stops and routes may be temporarily closed. Call 323.GO.METRO or use the Metro App (metro.net/riding/la-metro-app) for service updates and trip planning.

More Information
Local access, Pedestrian Access, and Emergency Responder Access will be maintained during work activities.

Construction is a dynamic process, and information is subject to change without notice.

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App for current service information and trip planning.

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.

Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. | Survey

Privacy Policy | Terms of Use
Copyright ©2026 Metro