|
The East San Fernando Valley Light Rail Transit (ESFV LRT) Project will improve connections and access to crucial destinations while connecting transit users to the growing network in the San Fernando Valley. The Southern Segment of the project includes a 6.7-mile at-grade alignment that will operate in the center of Van Nuys Bl, from the Metro G Line (Orange) Van Nuys Station to Van Nuys Bl and San Fernando Rd. SUMMARYAs part of the ongoing advanced utility work for the ESFV LRT Project, Metro’s contractor, San Fernando Transit Constructors (SFTC) will perform utility investigation. This work will include potholing operations and will require traffic lane closures on Van Nuys Bl between Tobias St and Parthenia St. Work to be performed will include traffic control, potholing operations and street restoration. Work will be performed on Monday through Saturday, between 8:00 pm and 6:00 am and Saturday, between 8:00am and 6:00pm. DATE AND WORK HOURSMonday, April 15, through June 2024, from 8:00pm to 6:00am (Mon to Sat) and 8:00am to 6:00pm (Sat). Weather permitting. LOCATIONVan Nuys Bl between Tobias St and Parthenia St. WHAT TO EXPECT· Van Nuys Bl will remain open with lane restrictions. · Access to private driveways, residences, and businesses will always be maintained unless notified in advance. · The road will be fully reopened to vehicular traffic and parking daily after work hours. · Flaggers will be provided at various locations to direct traffic and pedestrians if access is restricted. · Parking is restricted in posted areas, please follow the signage. · Bus stops may be temporarily relocated as necessary, please follow the signage. NOTEWORTHY· Access to emergency responders will be maintained. · Construction is a dynamic process and work schedules and timelines are subject to change. · Noise and dust control measures will be in place to minimize impacts. If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, Call 2‐1‐1 or 1 (800) 399‐6993 or visit 211LA.org. |
El Proyecto de Transporte de Tren Ligero del Este del Valle de San Fernando (ESFV LRT) mejorará las conexiones y el acceso a destinos cruciales mientras conecta a los usuarios del transporte público con la creciente red en el Valle de San Fernando. El segmento sur del proyecto incluye una alineación a nivel de 6.7-millas que operara en el centro de Van Nuys Bl, desde la estación Van Nuys de la Línea G del Metro (Naranja) hasta Van Nuys Bl y San Fernando Rd. RESUMENComo parte del trabajo avanzado de servicios públicos en curso para el Proyecto ESFV LRT, el contratista de Metro, San Fernando Transit Constructors (SFTC) realizará una investigación de servicios públicos. Este trabajo incluirá trabajos de exploración de suelo y requerirá el cierre de carriles de tráfico en Van Nuys Bl entre Tobias St y Parthenia St. El trabajo para realizar incluirá el control de tráfico, exploración de suelo y restauración de calles. El trabajo se realizará de lunes a sábado, entre 8:00pm y 6:00am y los sábados, entre 8:00am y 6:00pm. FECHA Y HORARIO DE TRABAJOLunes, 15 de abril, hasta junio 2024, de 8:00pm a 6:00am (lunes a viernes) y 8:00am a 6:00pm (sábados). Si el clima lo permite. UBICACIÓNVan Nuys Bl entre Tobias St y Parthenia St. QUÉ ESPERAR
NOTABLE
Si ve un campamento o alguien necesitado: Visite el sitio de solicitud de alcance en línea de LAHSA LA-HOP en www.lahsa.org/portal/apps/la-hop/request. Para obtener más información y referencias para cualquier servicio de salud y humanos, marque 2‐1‐1, o llame al 1 (800) 399‐6993 o visite 211LA.org. |