Wilshire Bl South Sidewalk Work Between S Crescent Dr and S Canon Dr

Summary 

The contractor will perform demo, curb, gutter, driveway, underground electrical, and sidewalk restoration work along the south side of Wilshire Bl from S Crescent Dr working west toward S Canon Dr. Work will be completed in segments requiring sidewalk and driveway closures to support construction activities. Pedestrians will be detoured to a temporary pathway adjacent to the existing sidewalk and access to business entrances will be maintained throughout the work. Periodic closures of the Sixty Beverly Hills driveway will be required for demolition, conduit installation, base material, and concrete placement. During this work, access to the Sixty Beverly Hills garage through the alley entrance on S Canon Dr will be coordinated as needed, with wayfinding signage provided for guests and visitors. A temporary ramp will be installed after driveway demolition to maintain vehicle access from Wilshire Bl. Fencing along the pedestrian access route will be uncovered to preserve visibility to the Ferrari showroom. While construction activities occur directly in front of the showroom windows protective measures will be implemented. 

Where 

  • South sidewalk along Willshire Bl between S Crescent Dr and S Canon Dr.   

When 

  • Anticipated Start Date: Friday, April 17th  
  • Anticipated Completion Date: Wednesday, June 17th  

Work hours:  

  • Daytime Work Hours: 8AM-4:30PM (Permitted noisy activities performed from 9am-4:30pm) 
  • Nighttime Work Hours: 8PM-4:30AM  

Traffic Control: 

  • Sidewalk closures will be implemented along the south side of Wilshire Bl between S Crescent Dr and S Canon Dr during construction. Pedestrian detours will be implemented. 
  • Permitted access to the Sixty Beverly Hills garage will be maintained through the alley, as needed. 
  • Intermittent closures of the Sixty Beverly Hills driveway on Wilshire Bl will require cars to access the premises from the alley driveway after 10PM.  
  • Wayfinding signage will be installed to direct hotel guests and pedestrians to the appropriate access routes. 
  • Temporary fencing and protection measures will be maintained around the work area to support pedestrian safety and protect adjacent properties. 
  • ADA compliant pedestrian access will be maintained during work activity.   
  • Driveway impacts will be coordinated with stakeholders.    
  • Flaggers will be on site to assist with vehicle and pedestrian activity.       

Noteworthy: 

  • All work has or will receive the necessary permits and approvals. 
  • Access to driveways, residences & businesses will be maintained at all times unless notified in advance. 
  • Access for pedestrians will be maintained outside of construction zones. 
  • Access for the Fire Department and emergency responders will be maintained. 
  • Parking restrictions will be implemented in the immediate area of the work zone. 
  • Construction is dynamic and schedules are subject to change.  
  • 24/7 Metro Hotline: 213-922-6934 

Metro Access: 

Metro bus stops may be relocated, or lines could be impacted. For information about changes to Metro service, please call 323.GoMetro. Passengers are encouraged to use the Transit App to plan their travels. 

Next Community Meeting 

  • D Line – Beverly Hills Stations, May 13, 2026, at 12pm, Virtual Link: https://us02web.zoom.us/j/82203486209 Webinar ID: 822 0348 6209 

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro bus stops may be relocated or lines could be impacted. For up to date information follow us on Twitter @metrolaalerts, metro.net/advisories or call 323.GOMETRO for updates and trip planning assistance. 

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.
Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. | Survey
Privacy Policy | Terms of Use
Copyright ©2026 Metro