Back to Construction Notices     Back to Project Page

Wilshire Bl: North Sidewalk Closure 

Summary 

Construction of two emergency stair exits for the UCLA Station will result in a full closure of the north sidewalk along Wilshire Bl between Gayley Av and Westwood Bl starting August 17, 2026, through December.

During this closure, entry to LA Fitness from Wilshire Bl and the Wilshire Bl entrance to the Westwood Medical Plaza will be closed continuously. Visitors may access the buildings through alternate entrances.

There will also be intermittent closures of the south sidewalk along Wilshire Bl between Gayley Av and Westwood Bl to accommodate concrete pours and material deliveries. Most of these activities are anticipated to occur during night shift operations (9pm to 5am) to minimize impacts.

Should both the north and south sides of this Wilshire Bl sidewalk are closed simultaneously, pedestrians will be temporarily detoured via Lindbrook Av.

Closure Map 


 

Noteworthy
  • All work has received the necessary permits and approvals. 
  • Access to driveways, residences & businesses will be maintained at all times unless notified in advance. 
  • Access for pedestrians will be maintained outside of construction zones. 
  • Access for the Fire Department and emergency responders will be maintained. 
  • Parking restrictions will be implemented in the immediate area of the work zone. 
  • Construction is dynamic and schedules are subject to change. 
  • 24/7 Hotline: 213-922-6934 

Access 

  • Access for Emergency Vehicles & First Responders will be maintained. 
  • Local access to residential streets and businesses will be maintained via side streets 
Business Interruption Fund
  • Metro's Business Interruption Fund (BIF) provides financial assistance to qualifying small “mom and pop” businesses directly impacted by construction; learn more by visiting metro.net/bif. To apply, visit Metro’s program administrator, Pacific Coast  Regional Small Business Development Corporation (PCR) 

Metro Updates

Construction is a dynamic process and information is subject to change without notice. Visit the project website for the most up to date information.

Local access, Pedestrian Access, and Emergency Responder Access is maintained during work activities. 

Metro Bus Service
Nearby bus stops or routes may be temporarily affected. Riders can call 323.GO.METRO or use Metro’s App for current service information and trip planning.  

If you see an encampment or someone in need: Visit LAHSA's online outreach request site LA-HOP at https://www.lahsa.org/portal/apps/la-hop/request. For more information and referrals for any Health and Human Services, call 2‐1‐1 or visit 211LA.org.
Did this work notice help?
Help improve how Metro shares construction updates. Take a short survey to tell us whether this notice was clear, useful, and easy to understand. | Survey
Privacy Policy | Terms of Use
Copyright ©2026 Metro